Monday, 24 October 2011

DAY 1 of Filming : PRODUCTION

Filming:

The first day of filming was on Thursday the 18th of October. Filming took place in two locations, the Barbican Centre and then the Old Street Canal. As planned my group and I went to film at the Barbican centre first. We shot 2 base tracks at the Barbican Location, a Mid Shot and My Idea of having the artist in the same shot 3 times all at once. I also decided that we should shoot some shots of the artist 'Talia' walking or sitting in the scenery, these shot could be used as cutaway shots in the Music Video.

Problems:

Just the planning of having our artist do three separate base tracks that then will be combined to make one flowing sequence was a great hassle. Firstly I had to lay markers down on the floor, this was so that Talia wouldn't move from the position she should be otherwise when we come to edit and she has moved the effect would no work.

The weather also played an important role in causing us alot of problems. Although it was clear sky's and mostly sunny, the temperature was not and it was freezing for the duration of filming, this made it hard because we needed our hand to be glove free in order to play the music via our phones. 

Moving Forward:

Out of the 5 Base tracks we need to run throughout our music video I believe that as of Day 1 of filming we have completed 2 and so must film on another day to complete filming.

No comments:

Post a Comment